Engineers Report - January 2012

This weekend has seen more work on fitting conduit for the cable runs for TPWS.  No 1 engines fuel filter assembly repaired due to a small fuel leak.  The fuel system was then primed to test the repair and it was successful. Under the cab floors were hoovered to remove 30 years of rubbish and then the handbrake mechanism's were lu [...]

Koyli Engineers report

Work continued fitting equipment for the TPWS.  The AWS box was disconnected and removed ready for the TPWS box to be fitted. Both cab floors have being lifted to fit conduit for the TPWS circuit.  No 2 engine governor as returned from Essex governor sevices after overhaul and fitted.  This unit was sent there due to when on full p [...]