News

Engineers update - 4th May 2012

55002 was started up on Friday the 4th of May on both engines and did several runs up and down in the North yard at York.  The loco had a brake test in both air and vacuum and passed. 

Just 1 fault to report, the top compressor is fairly slow at building air up.  An investigation to the fault is on going.

<< Go back to the previous page



Published on  September 25th, 2011